Listed below are the projects completed during Work Weekend 2009
- Repair and secure all doors on boathouses
- Repair lights and fan and ceiling tiles in Dining Hall
- Pick up branches and trees that are down
- Chip up branches and limbs after they are collected
- Clear pioneer roads for wagon, make sure branches can’t hit people on wagon
- Clean 1 cabin in each Homestead
- Clean CATS
- Replace missing shingles on front of Log Cabin
- Put benches on wagon for hay rides. 2 rows down center
- Put up shutters/windows on Dining Hall
- Straighten P-3 for tours
- Clean up Delma’s garden
- Beach – Dock and tower ladder are about 1’ out of the sand
- Cut ornamental grass at CEC to 8-10”
- Clean off tennis court
- Put holds back on climbing wall – make sure both sides on front are usable
- Repair water pipes under CEC
- Put block floor in slop bucket pen. Repair rat wire
- Repair wind chime at Chapel
- Put low ropes equipment out
- Re-attach gutter on bay side of CEC
- Clean Chapel