Listed below are the projects completed during Work Weekend 2009

  • Repair and secure all doors on boathouses
  • Repair lights and fan and ceiling tiles in Dining Hall
  • Pick up branches and trees that are down
  • Chip up branches and limbs after they are collected
  • Clear pioneer roads for wagon, make sure branches can’t hit people on wagon
  • Clean 1 cabin in each Homestead
  • Clean CATS
  • Replace missing shingles on front of Log Cabin
  • Put benches on wagon for hay rides. 2 rows down center
  • Put up shutters/windows on Dining Hall
  • Straighten P-3 for tours
  • Clean up Delma’s garden
  • Beach – Dock and tower ladder are about 1’ out of the sand
  • Cut ornamental grass at CEC to 8-10”
  • Clean off tennis court
  • Put holds back on climbing wall – make sure both sides on front are usable
  • Repair water pipes under CEC
  • Put block floor in slop bucket pen. Repair rat wire
  • Repair wind chime at Chapel
  • Put low ropes equipment out
  • Re-attach gutter on bay side of CEC
  • Clean Chapel